Custom Townhouse Construction  ·  Dual Occupancy  ·  Wollongong & the Illawarra

A Comfortable, Low-Running-Cost Home Built on Passive Design, Not Promises

NatHERS 7-star compliant custom homes built across Wollongong, Shellharbour, Kiama, and Shoalhaven, with passive solar design, thermal envelope construction, and BASIX compliance integrated from the first drawing, not bolted on at the end.

Accredited & Award-Winning

Trusted Wollongong Builder Since 2014

  • Master Builders Association approved builder, Wollongong
    Master Builders Association
  • Association of Professional Builders member, Wollongong
    Association of Professional Builders
  • Google 5.0 star rated builder, Top Rated Services 2026, verified by Trustindex
    5.0 Google Rated · 2026

NSW Builders Licence 258735C

A 7-star NatHERS rating and BASIX certification are achievable on almost any new residential project in NSW. The question is how you get there and what it costs to live in the result. A home that passes compliance on paper but was not designed around passive principles from the start can still be cold in winter, overheated in summer, and expensive to run year-round.

At CKS Projects in Wollongong, sustainable construction starts with your site's specific solar orientation, prevailing winds, and climate zone across the Illawarra and South Coast. Keiron Moore and the CKS team design the thermal envelope first, positioning living spaces for northern solar access, sizing eave overhangs to shade summer sun while admitting winter light, selecting wall and roof insulation specifications for the actual climate zone, and orienting glazing for cross-ventilation before any discussion of solar panels, heat pumps, or smart monitoring systems begins.

That sequence matters. Passive design reduces what active systems need to do, which reduces their size, their cost, and your ongoing energy bills. A home designed around passive principles first and fitted with appropriately scaled active systems second will outperform a conventionally designed home with maximum solar and the best HVAC money can buy.

What builder-led eco construction actually means

Integrated Passive Design, Not a Checklist of Green Add-Ons

Why eco homes so often disappoint

What Goes Wrong When Sustainability Is an Afterthought

The gap between what an eco home is supposed to deliver and what many homeowners actually experience comes from one consistent source: sustainability decisions made after the design is locked in.

  • Homes are designed with the floor plan, room layout, and glazing ratios set by aesthetic preference, then assessed against NatHERS targets at the end of the design phase, when the only levers left are expensive upgrades to insulation, double glazing, or mechanical systems rather than the orientation and layout changes that would have been straightforward at the beginning

  • Solar panel arrays and battery systems are sized and specified to compensate for a poorly performing thermal envelope, adding upfront cost that passive design decisions made earlier in the process would have made unnecessary or at least significantly smaller

  • Coastal and escarpment Illawarra sites introduce corrosion exposure, salt air, humidity, and wind loading that conventional eco home specifications do not account for, producing material degradation and performance drop-off within five to ten years on builds that should last fifty

  • BASIX is treated as a compliance tick rather than a design tool, producing certificates that satisfy the minimum requirements but do not push thermal performance or water efficiency beyond the legal floor, leaving homeowners with energy bills that are lower than a standard build but higher than a well-designed passive home would produce

  • Active systems including smart home monitoring, rainwater harvesting, greywater recycling, and mechanical ventilation are specified without a clear picture of running costs, maintenance requirements, or the actual energy and water savings they will deliver for that specific household

Builder-led eco construction at CKS Projects resolves each of these issues by treating passive design as the foundation and active systems as the complement, in that order, for every project.

Sustainable construction at CKS Projects is a whole-of-project commitment, from the climate analysis that shapes the initial concept through to the systems walkthrough at handover that gives you a clear picture of how to run your new home efficiently.

  • Site climate analysis and passive solar strategy, mapping solar angles, prevailing winds, and shading across your specific Illawarra or Shoalhaven block to determine optimal building orientation, window placement, eave depth, and thermal mass positioning before the design begins

  • Thermal envelope design and specification, selecting wall, ceiling, and floor insulation ratings, window and glazing types, airtightness detailing, and thermal mass materials matched to your climate zone and budget, not to a generic specification sheet

  • NatHERS 7-star simulation and BASIX certification, completing the full thermal performance model and water efficiency assessment as part of the design process, identifying opportunities to exceed the minimum compliance floor and produce a home that genuinely performs rather than one that just passes

  • Energy and water systems integration, specifying rooftop solar, battery storage, heat pump hot water, rainwater harvesting, greywater recycling, and mechanical ventilation at a scale matched to the passive performance of the building envelope and the actual consumption profile of your household

  • Sustainable material selection, prioritising durable, low-embodied-energy materials appropriate for coastal and escarpment conditions across the Illawarra, including corrosion-resistant cladding, responsibly sourced timber, and finishes selected for longevity rather than initial cost

  • NCC 2022 compliant construction, applying current energy efficiency provisions, bushfire attack level (BAL) ratings, and structural requirements to every project as standard, with all documentation coordinated for DA or CDC lodgement

  • Handover and optimisation, including a full systems walkthrough, smart home and monitoring setup where specified, and a maintenance guide covering the specific products and specifications used in your build

What CKS Projects designs and builds

A Complete Eco Home Service From Site Analysis to Handover

How it works

The Eco Home Build Process With CKS Projects

Every stage of the process is designed so that sustainability decisions are made when they cost the least and contribute the most, at the beginning of the project, not as expensive corrections at the end.

Step 01

Discovery and Site Climate Analysis

We start with your site's specific characteristics, mapping solar access, wind patterns, shading from trees or adjacent structures, and the climate zone applicable to your Wollongong, Shellharbour, Kiama, or Shoalhaven location. Your lifestyle goals, household patterns, and sustainability priorities are established here so the design responds to how you actually live.

Step 02

Sustainable Concept Design

We develop an initial concept that positions the building on the site for optimal solar access and natural cross-ventilation, with living spaces and glazing oriented to capture winter sun and exclude summer heat. Thermal mass strategy, eave depths, and shading elements are resolved at this stage, before structural decisions are locked in.

Step 03

Performance Modelling and Compliance

We complete the NatHERS thermal simulation and BASIX assessment against the finalised design, confirming the 7-star performance target is met and identifying any specification adjustments needed to optimise both compliance and real-world comfort. Energy and water systems are sized against the modelled performance at this stage.

Step 05

Handover and Optimisation

We complete a full walkthrough of all energy and water systems, configure smart monitoring where specified, and provide a written maintenance guide covering the specific insulation, glazing, cladding, and systems products used in your build, so you understand how to get the most from the home long after handover.

Step 04

Eco-Conscious Construction

We build to the thermal specifications modelled in the design phase, with quality inspections at each stage focused on airtightness detailing, insulation installation, glazing installation tolerances, and systems integration. Material selections are confirmed and staged to minimise waste and maintain supply chain consistency across the build program.

Who this service suits

Built for Homeowners Who Want Comfort and Efficiency, Not Just Compliance

Eco home construction at CKS Projects suits anyone building a new home on the Illawarra or Shoalhaven who wants measurably lower energy bills, year-round thermal comfort, and a home designed to last on a coastal or escarpment site.

Families Building New Homes

Families building their long-term home on the Illawarra or South Coast who want a design that is comfortable to live in year-round without relying on constant heating and cooling to compensate for a poorly performing building envelope.

Coastal and Escarpment Builds

Projects on Illawarra coastal blocks or escarpment sites where salt air corrosion, humidity, strong winds, and challenging solar geometry require a site-specific sustainability approach rather than a standard specification.

NCC 2022 Compliant New Builds

Anyone building a new residential project that needs to meet or exceed current NCC 2022 energy efficiency provisions, BASIX water and energy targets, and NatHERS minimum star ratings as part of the DA or CDC approval process.

Environmentally Focused Owners

Homeowners for whom reducing energy consumption, embodied carbon, and ongoing resource use is a genuine priority alongside design quality and construction budget, not just a marketing preference.

Long-Term Value Investors

Homeowners and investors who understand that a well-specified thermal envelope and passive design produce measurable long-term savings in energy costs and maintenance, and want those benefits documented and verified through NatHERS and BASIX.

Knockdown Rebuilds

Landowners replacing an existing dwelling with a high-performance new home and wanting to take full advantage of the opportunity to design the thermal envelope, orientation, and systems from scratch rather than inheriting the constraints of an existing structure.

There is a significant difference between sustainability advice from a consultant and sustainability decisions made by someone who has built residential homes in salt-air coastal zones, on south-facing escarpment blocks, and in the specific climate conditions of the Wollongong and Shoalhaven regions for over 25 years.

When CKS Projects specifies a corrosion-resistant cladding system, a particular insulation installation method, or a glazing specification for a north-facing coastal living room, it comes from direct experience with how those materials and details perform in Illawarra conditions over time, not from a generic sustainable design guide written for a different climate.

Builder-led sustainability

Eco Advice From Someone Who Has Built on the Illawarra Coast

Eco-conscious upgrades to insulation, glazing, and passive design typically deliver a measurable reduction in heating and cooling loads. Fixed-price build contracts are issued after design is finalised so sustainability scope is clear and costed before construction begins.
Keiron worked with us and the architect with positivity and practical solutions throughout the design process.
— Geoff McIntosh, CKS Projects client

Common questions

Eco Home and 7-Star Energy Efficiency Questions Answered

Get started

Start With a Free Eco Design Consultation

Bring your site, your brief, and your sustainability goals. We will give you a clear picture of what passive design can achieve on your specific block, what systems make sense for your household, and what the real cost and long-term saving of a genuinely high-performance home looks like before any design fees are committed.

Prefer to call directly? 0416 978 669Wollongong office  ·  By appointment

CONTACT US

CKS PROJECTS

Unit 45/7 Waynote Place,

Unanderra NSW 2526

By Appointment Only

PHONE: 02 4271 5132

Monday to Friday: 8.00am - 4.30pm


Proudly Partnered with

Illawarra Region | Stanwell Park | Scarborough | Clifton | Wombarra | Austinmer | Thirroul | Bulli | Woonona | Towradgi | Wollongong | Port Kembla | WIndang | Warilla | Shellharbour Region | Kiama | Gerringong | Gerroa | Shoalhaven Region | Berry | Huskisson | Southern Highlands Region | Bowral | Burradoo | Moss Vale

We use cookies to improve user experience. You can also check out our Privacy Policy