Choosing a Builder Keiron Moore Choosing a Builder Keiron Moore

Architect, Building Designer or Design and Construct Builder: Who Should Design Your Home?

An architect, building designer or design and construct builder can all design a new home, but the process differs. Architects and building designers usually complete the design before a builder is chosen. Design and construct brings design, pricing and construction together, helping keep the home aligned with the budget from the start.

Read More
Keiron Moore Keiron Moore

Builder Inclusions Lists vs Custom Selections: What a Price List Doesn't Tell You

A builder’s price list only tells part of the story. An inclusions list covers the standard fixtures, fittings and finishes included in the base price, while anything outside that range is usually an upgrade. With custom selections, each item is specified and priced for your home before you sign. Always compare what is included, not just the headline price.

Read More
Keiron Moore Keiron Moore

Prime Cost Items vs Provisional Sums: What Your Builder's Allowances Really Mean

Prime cost items and provisional sums are allowances in a building contract for costs that cannot be finalised when you sign. A PC item covers products you will choose later, such as tapware or appliances. A provisional sum covers uncertain work, such as excavation. If the actual cost exceeds the allowance, you usually pay the difference plus the builder’s margin.

Read More
Keiron Moore Keiron Moore

Spec Home vs Project Home vs Custom Home: Which Is Right for You?

A spec home is built before a buyer is found, a project home uses a preset builder plan on your land, and a custom home is designed specifically for your block and lifestyle. Spec homes are usually quickest, while custom homes offer the most flexibility, especially for sloping, unusual or view-facing sites.

Read More
Marcelo Andres Soler Marcelo Andres Soler

Fixed Price vs Cost Plus Contracts: Which Should You Sign in NSW?

A fixed-price building contract sets the agreed cost for a defined scope before construction starts, giving you greater budget certainty. With a cost-plus contract, you pay the builder’s actual costs plus an agreed margin, so the final price can change. For a well-documented new home, fixed price usually provides more certainty.

Read More
Keiron Moore Keiron Moore

How Much Does It Cost to Build a 4 Bedroom House in NSW? (2026 Guide)

Building a 4 bedroom house in NSW in 2026 typically costs $2,000–$3,800 per m². A 250 m² mid-range home may cost around $600,000–$700,000 for construction alone, or roughly $735,000–$955,000 all-in once site works, approvals, connections, landscaping and contingency are included. Land is additional.

Read More
Keiron Moore Keiron Moore

How Much Does a Home Extension Cost in NSW? (2026 Guide)

A home extension in NSW in 2026 typically costs $2,000–$3,800 per m² for a ground-floor addition and $2,400–$4,400 per m² for a second storey. A 45 m² mid-range ground-floor extension may cost around $108,000–$126,000 to build, or roughly $145,000–$195,000 all-in once site works, approvals, fees and contingency are included.

Read More
Keiron Moore Keiron Moore

How Do You Get Accurate Building Quotes for Your Duplex in Wollongong?

Getting building quotes for a duplex shouldn't feel like decoding a foreign language. Yet here you are, staring at three wildly different numbers, wondering why one builder quoted $850,000 while another came in at $1.2 million for what looks like the same project. 

I've seen too many Wollongong duplex projects stall because people didn't know how to request proper quotes. Let me save you months of frustration and potentially tens of thousands of dollars. 

Read More
Costs, Knockdown Rebuild Keiron Moore Costs, Knockdown Rebuild Keiron Moore

How Much Does a Knockdown Rebuild Cost in NSW? (2026 Guide)

A knockdown rebuild in NSW in 2026 typically costs $2,000–$3,800 per m² for construction. A 240 m² mid-range home may cost around $576,000–$672,000 to build, or roughly $765,000–$1.02 million all-in once site works, approvals, connections, landscaping and contingency are included. Demolition and asbestos costs are assessed separately.

Read More
Keiron Moore Keiron Moore

Can You Build a Duplex on a Narrow Block in Wollongong?

Yes, it's possible to build a duplex on a narrow block, but with conditions. After 25 years of building duplexes across Wollongong and the South Coast, I've designed countless solutions for narrow blocks that looked impossible initially. 

Read More
Keiron Moore Keiron Moore

How Much Does It Cost to Build a House in NSW? (2026 Guide)

Building a house in NSW in 2026 typically costs $2,000–$3,800 per m² for construction alone. A 200 m² mid-range home may cost around $480,000–$560,000 to build, or roughly $655,000–$890,000 all-in once site works, approvals, connections, landscaping and contingency are included. Land is additional.

Read More
Keiron Moore Keiron Moore

The Cheapest Way to Build a House in NSW: 9 Savings That Matter

The cheapest way to build a house in NSW is usually a compact, single-storey design on a flat block with a simple footprint and basic to mid-range finishes. A 180 m² home built this way may cost around $525,000–$740,000 all-in before land. Steep sites, complex designs and premium finishes can push the same-size home above $1 million.

Read More
Costs Keiron Moore Costs Keiron Moore

How Much Does a Granny Flat Cost in NSW? (2026 Guide)

Building a granny flat in NSW in 2026 typically costs $2,000–$3,800 per m² for construction alone. A 60 m² mid-range granny flat may cost around $144,000–$168,000 to build, or roughly $175,000–$230,000 on a flat block once site works, approvals, council contributions and contingency are included. Design, connections and landscaping are additional.

Read More