How Much Does a Granny Flat Cost in NSW? (2026 Guide)

The short answer

What a granny flat costs to build in NSW

Construction alone typically costs $2,000–$3,800 per square metre, set mostly by the finish level. A 60 m² granny flat at a mid-range finish costs about $144,000–$168,000 to build. Site works, approvals, council contributions and a 10–15% contingency take it to about $175,000–$230,000 on a flat block, before design, service connections and landscaping, which are priced for your site.

  • $2,000–$3,800per m², construction only
  • $144k–$168kto build 60 m², mid-range
  • $175k–$230kworked example, flat block
  • 60 m²standard NSW size limit

Free site feasibility check with the builder. A fixed-price contract before you sign. NSW contractor licence 258735C.

By Keiron Moore, Director of CKS Projects, with 25+ years building on the South Coast. Updated October 2026.

Important Disclaimer:

“This article is general guidance, not an exact price guide, guaranteed returns, or a substitute for professional advice or a formal quote. Construction costs, rental yields, and capital growth examples reflect 2025 conditions and will vary with site constraints, design, materials, and market movements. Speak with a qualified financial adviser before making investment decisions. For accurate estimates and design recommendations for your site, contact CKS Projects. We’ll provide a comprehensive consultation and a formal quote tailored to your Wollongong granny flat.”

Government charges are as published at the date shown and change over time.

Granny flat cost estimator

Estimate your granny flat in three clicks

Choose the floor area, the finish and your block. The range uses CKS Projects' guide figures and the current NSW and Wollongong charges.

1. Floor area
2. Finish level
3. Your block

40 m² · Basic · Flat (CDC pathway assumed)

$105,000 – $145,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$80,000 – $96,000
Before contingency
$95,000 – $125,000

40 m² · Basic · Moderate slope (CDC pathway assumed)

$140,000 – $200,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$80,000 – $96,000
Before contingency
$125,000 – $175,000

40 m² · Basic · Steep slope (DA pathway assumed)

$195,000 – $295,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$80,000 – $96,000
Before contingency
$180,000 – $255,000

40 m² · Mid-range · Flat (CDC pathway assumed)

$125,000 – $165,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$96,000 – $112,000
Before contingency
$110,000 – $145,000

40 m² · Mid-range · Moderate slope (CDC pathway assumed)

$155,000 – $220,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$96,000 – $112,000
Before contingency
$140,000 – $195,000

40 m² · Mid-range · Steep slope (DA pathway assumed)

$215,000 – $315,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$96,000 – $112,000
Before contingency
$195,000 – $275,000

40 m² · Premium · Flat (CDC pathway assumed)

$150,000 – $210,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $152,000
Before contingency
$135,000 – $185,000

40 m² · Premium · Moderate slope (CDC pathway assumed)

$185,000 – $270,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $152,000
Before contingency
$165,000 – $235,000

40 m² · Premium · Steep slope (DA pathway assumed)

$240,000 – $360,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $152,000
Before contingency
$220,000 – $315,000

50 m² · Basic · Flat (CDC pathway assumed)

$130,000 – $175,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$100,000 – $120,000
Before contingency
$115,000 – $150,000

50 m² · Basic · Moderate slope (CDC pathway assumed)

$160,000 – $230,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$100,000 – $120,000
Before contingency
$145,000 – $200,000

50 m² · Basic · Steep slope (DA pathway assumed)

$220,000 – $325,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$100,000 – $120,000
Before contingency
$200,000 – $280,000

50 m² · Mid-range · Flat (CDC pathway assumed)

$150,000 – $195,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $140,000
Before contingency
$135,000 – $170,000

50 m² · Mid-range · Moderate slope (CDC pathway assumed)

$185,000 – $255,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $140,000
Before contingency
$165,000 – $220,000

50 m² · Mid-range · Steep slope (DA pathway assumed)

$240,000 – $345,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $140,000
Before contingency
$220,000 – $300,000

50 m² · Premium · Flat (CDC pathway assumed)

$185,000 – $255,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$150,000 – $190,000
Before contingency
$165,000 – $220,000

50 m² · Premium · Moderate slope (CDC pathway assumed)

$215,000 – $310,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$150,000 – $190,000
Before contingency
$195,000 – $270,000

50 m² · Premium · Steep slope (DA pathway assumed)

$275,000 – $405,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$150,000 – $190,000
Before contingency
$250,000 – $350,000

60 m² · Basic · Flat (CDC pathway assumed)

$150,000 – $200,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $144,000
Before contingency
$135,000 – $175,000

60 m² · Basic · Moderate slope (CDC pathway assumed)

$185,000 – $260,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $144,000
Before contingency
$165,000 – $225,000

60 m² · Basic · Steep slope (DA pathway assumed)

$240,000 – $350,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$120,000 – $144,000
Before contingency
$220,000 – $305,000

60 m² · Mid-range · Flat (CDC pathway assumed)

$175,000 – $230,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$144,000 – $168,000
Before contingency
$160,000 – $200,000

60 m² · Mid-range · Moderate slope (CDC pathway assumed)

$210,000 – $285,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$144,000 – $168,000
Before contingency
$190,000 – $250,000

60 m² · Mid-range · Steep slope (DA pathway assumed)

$270,000 – $380,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$144,000 – $168,000
Before contingency
$245,000 – $330,000

60 m² · Premium · Flat (CDC pathway assumed)

$215,000 – $300,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$180,000 – $228,000
Before contingency
$195,000 – $260,000

60 m² · Premium · Moderate slope (CDC pathway assumed)

$250,000 – $355,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$180,000 – $228,000
Before contingency
$225,000 – $310,000

60 m² · Premium · Steep slope (DA pathway assumed)

$310,000 – $450,000

With a 10–15% contingency. Excludes design, connections and landscaping

Construction
$180,000 – $228,000
Before contingency
$280,000 – $390,000

Indicative only, not a quote. Includes construction, site works, a geotechnical report, approval and occupation certificate fees, the Wollongong s7.12 levy on the cost and a 10–15% contingency. Excludes design and engineering, water, sewer and power connections, landscaping, demolition and finance costs, which CKS Projects prices for your site.

NSW rules

Can your block take a granny flat?

NSW calls a granny flat a secondary dwelling. The Housing SEPP sets the main rules, and your council's plans add setbacks and site coverage.

Size

Up to 60 m², or larger where your council's local environmental plan allows it.

Lot size for a CDC

At least 450 m² to use complying development. Smaller lots may still go through a DA.

One of each

Only one principal dwelling and one secondary dwelling on the lot. It can be detached, attached or within the house.

No subdivision

A lot with a secondary dwelling on it cannot be subdivided, so the granny flat can't be sold on its own title.

Source: NSW Planning, secondary dwellings (Housing SEPP). Complying development is not available in R5 Large Lot Residential zones.

Construction rates

What does a granny flat cost per square metre?

Finish level sets most of the rate. Small homes carry a full kitchen, bathroom and laundry in very little floor area, so the finish you choose for those rooms moves the price more than the size does.

Finish levelPer m²40 m²50 m²60 m²
Basic$2,000–$2,400$80k–$96k$100k–$120k$120k–$144k
Mid-range$2,400–$2,800$96k–$112k$120k–$140k$144k–$168k
Premium$3,000–$3,800$120k–$152k$150k–$190k$180k–$228k
Construction only. CKS Projects guide ranges for 2025–26.
Huskisson by CKS Projects. In a small home the kitchen and bathroom specification sets the budget.
Worked example

A full granny flat budget, line by line

A 60 m² detached granny flat at a mid-range finish, on a flat block in the Wollongong local government area, approved as complying development (CDC).

ItemLowHigh
Construction: 60 m² at $2,400–$2,800 per m² (mid-range)$144,000$168,000
Site preparation, flat block$10,000$20,000
Geotechnical report$1,500$2,500
Approval: CDC plus occupation certificate$4,500$7,500
Council contributions, Wollongong s7.12 at 0.5% of cost$720$840
Housing and Productivity Contribution (not charged on a granny flat)$0$0
Long Service Levy (only on work of $250,000 or more)$0$0
Subtotal$160,000$200,000
Contingency, 10% (low) to 15% (high)$15,000$30,000
Total, before the site-specific items below$175,000$230,000
Design, drafting and engineeringPriced for your site
Water, sewer and power connectionsPriced for your site
Landscaping, paths and fencingPriced for your site
Totals rounded to the nearest $5,000. Also not included: land, demolition, stamp duty and finance costs.

Design, connections and landscaping depend on where the granny flat sits on your block and how far the services have to run, so CKS Projects prices them after the site feasibility check rather than guessing.

State and council charges

The charges you do and don't pay on a granny flat

Housing and Productivity Contribution: $0

NSW Planning lists the construction of secondary dwellings among the developments that do not require the HPC.

Council contributions

Wollongong's City-Wide Development Contributions Plan (2026) levies nil up to $100,000, 0.5% from $100,000 to $200,000 and 1% above $200,000 of the cost of development. Other councils set their own plans.

Long Service Levy: often $0

The levy is 0.25% of building work of $250,000 or more. Most granny flats cost less than that, so none is payable.

BASIX

A granny flat is a new dwelling, so it needs a BASIX certificate for energy, water and thermal performance.

Home building compensation cover

Your builder must take out home building compensation (HBC) cover for residential work over $20,000.

Written contract and deposit

Work over $20,000 needs a written large-job contract, and the deposit can't be more than 10%.

Sources: NSW Planning, HPC worked examples (Example 1); Wollongong City Council, development contributions; NSW Government, Long Service Levy; NSW Planning Portal, BASIX; NSW Government, building contracts.

Kit vs custom

Kit vs custom-built granny flats: what the price leaves out

Kit and flat-pack studios are advertised at an attractive price, but the advertised price rarely reflects the cost of having one installed and approved on your block. Check whether a kit price includes:

  • site preparation, a concrete slab or pier footings, and stormwater drainage
  • water, sewer and power connections from the main house
  • approval documentation, BASIX and structural engineering
  • construction by a licensed builder, with home building compensation cover and statutory warranties
  • finishes that match your existing home

A like-for-like comparison that includes all of these usually narrows the gap a long way.

CKS Projects carpenters fitting a window frame during construction at Wombarra
Construction by CKS Projects at Wombarra. A licensed builder carries the warranty and the compensation cover.
Your options

Granny flat vs extension vs duplex

Granny flatHome extensionDuplex
What you getA second, self-contained home of up to 60 m² on your lotMore space in the home you haveTwo homes on one lot
Separate titleNo: the lot can't be subdividedNoPossible, with Torrens or strata subdivision
Housing and Productivity ContributionNot chargedUsually not chargedCharged for 1 net new dwelling on an existing lot
Cost guideThis guideHome extension costDuplex cost

Ready to compare builders? See home extension builders in Wollongong or duplex builders in Wollongong.

Approvals

CDC vs DA for a granny flat

Complying development (CDC)Development application (DA)
When it appliesThe lot is at least 450 m² and every Housing SEPP standard is metA smaller lot, an R5 zone, or a design that doesn't meet the standards
Approval fees$3,000–$5,000$8,000–$15,000, plus a construction certificate at $3,000–$5,000
TimeIn as little as 20 days12–16 weeks minimum
Both pathwaysAn occupation certificate and a BASIX certificate

Fee ranges are CKS Projects' guide figures. CDC timing: NSW Planning, complying development.

Working with CKS Projects

How CKS Projects prices a granny flat

Ocean Windang by CKS Projects: the same finish standard at any scale.
  1. Site feasibility check

    Your lot is checked against the secondary dwelling rules and your council's controls, to confirm the size and position that's achievable.

  2. Design for your block

    A layout and finishes matched to your main home, not a catalogue.

  3. Approvals

    The CDC or DA package, including BASIX and structural engineering, lodged and managed for you.

  4. Fixed-price contract

    The full scope priced before work starts. Any variation is documented and priced before it proceeds.

More on custom studio and granny flat builders in Wollongong. Building a whole new house? See what a house costs to build in NSW. Planning a family home with room to grow? See what a 4 bedroom house costs. Comparing quotes? Read fixed price vs cost plus contracts.

Questions

Granny flat cost FAQs

How much does a granny flat cost to build in NSW?

Construction alone typically costs $2,000–$3,800 per square metre, set mostly by the finish level. A 60 m² granny flat at a mid-range finish costs about $144,000–$168,000 to build. With site works, approvals, council contributions and a 10–15% contingency it comes to about $175,000–$230,000 on a flat block, before design, service connections and landscaping, which are priced for your site.

How big can a granny flat be in NSW?

Under the Housing SEPP a secondary dwelling can be up to 60 m², or larger where your council's local environmental plan allows it. There can be only one principal dwelling and one secondary dwelling on the lot.

What size block do I need for a granny flat?

To be approved as complying development (a CDC), the lot must be at least 450 m². On a smaller lot, or where the standards aren't met, you may still be able to lodge a development application with your council.

Do you need council approval for a granny flat?

Yes. A granny flat needs either a complying development certificate, which a certifier can issue when every standard is met, or a development application to council. A new house and a granny flat can be approved together under a single CDC.

Can I subdivide and sell a granny flat separately?

No. A lot with a secondary dwelling on it cannot be subdivided. If you want two homes you can sell separately, look at a duplex instead.

Do you pay the Housing and Productivity Contribution on a granny flat?

No. NSW Planning lists the construction of secondary dwellings among the low-density developments that do not require the HPC.

Do council contributions apply to a granny flat?

In Wollongong, the City-Wide Development Contributions Plan levies a percentage of the cost of development under section 7.12: nil up to $100,000, 0.5% from $100,000 to $200,000 and 1% above $200,000. Other councils set their own plans, so ask your council for a contributions estimate.

Is a kit granny flat cheaper than a custom-built one?

The advertised kit price is lower, but it rarely includes site preparation, a slab or pier footings, stormwater, service connections or compliance certification. Compare a like-for-like, fully installed price before you decide.

How long does it take to build a granny flat?

Construction of a custom studio or granny flat typically takes 3–6 months from approval, depending on size, site conditions and specification. A CDC can be approved in as little as 20 days when every standard is met.

Does a slope add much to the cost of a granny flat?

Site works are priced on the block, not the size of the building. On CKS Projects' figures, a flat block needs about $10,000–$20,000 of site works, a moderate slope $40,000–$70,000 and a steep block $80,000–$120,000.

About the author

Keiron Moore is the Director of CKS Projects, a Wollongong builder based in Unanderra with 25+ years' experience in residential construction. CKS Projects holds NSW contractor licence 258735C and won at the 2026 MBA NSW Southern Regions awards for Wombarra Clifftops. See our verified credentials.

Find out what your block can take

Tell us your address and what you have in mind. We'll check the block for free, then price your granny flat at a fixed price before you sign.