How Much Does a Knockdown Rebuild Cost in NSW? (2026 Guide)
A knockdown rebuild in NSW in 2026 typically costs $2,000–$3,800 per m² for construction. A 240 m² mid-range home may cost around $576,000–$672,000 to build, or roughly $765,000–$1.02 million all-in once site works, approvals, connections, landscaping and contingency are included. Demolition and asbestos costs are assessed separately.
How Much Does It Cost to Build a Duplex in NSW? (2026 Guide)
Building a duplex in Australia can run from about $550,000 to $1.3 million. Wollongong comes with its own cost quirks. After 25 years of building duplexes across the South Coast, I’ve seen one pattern repeat: most people underestimate the real price.
How Much Does a Granny Flat Cost in NSW? (2026 Guide)
Building a granny flat in NSW in 2026 typically costs $2,000–$3,800 per m² for construction alone. A 60 m² mid-range granny flat may cost around $144,000–$168,000 to build, or roughly $175,000–$230,000 on a flat block once site works, approvals, council contributions and contingency are included. Design, connections and landscaping are additional.
How to Establish a Realistic Home Building Budget
We know we’ve been telling you about this, but building a home is one of the most important investments you’ll ever make and it involves many things— planning, time, design, workers, home building budget, and more.